6. huhtikuuta 2015

Rip off the winter coat

Picasso


Jobs done:
- calling for Mercury service, and get them replacing impeller for sea water pump, gas filters, new zincs for sterndrive, grease all maintenance spots, checking steering connections, checking belt tension
- painting sterndrive and trim tabs
- sanding the bottom
- removing winter tarp and framework
- power washing the deck and cockpit
- cleaning, cleaning...
- treating camper canvas and stretching it into its place
- inside installations (see Insides)
- Mein Kampf: ramming in the mattress for mid cabin and ventilation net under it
- greasing and reinstalling the Jabsco toilet pump

Needs to be done:
- painting the bottom
- change bow thruster zinc
- washing and waxing the hull
- loose connection in battery, work it safe
- install fresh water pump
- refuel and off she goes


Storaging locker

Ei kommentteja:

Lähetä kommentti